Rocland tunnel closure anticipated dates are October 9 through October 23

Trail Construction Photos

Select an image for a closer look.

Getting the trail ready to pave through the 2868 foot long Rockland Tunnel that is 21 miles south of Franklin.

The floor of the Deep Valley Tunnel leveled out to prepare to lay a new foundation.

Here you see the rebar for the walls of the inner liner for the Deep Valley Tunnel.

Here you see the new concrete floor with rebar for the walls of the inner liner for the Deep Valley Tunnel.

Forms for creating the side walls for the tunnel liner for the Deep Valley Tunnel.

The walls for the Deep Valley Tunnel liner.

Some of the tires that will be used to fill the gap between the liner and the existing tunnel wall.

The gap that the tires will be used to fill in.

Construction Equipment for Tunnel.

The wall with the archway on top.